EV Charger Installation & Electrical Panel Upgrades
Two specialties, one licensed team. Whether you need a charger installed or your panel brought up to modern capacity, we handle it from assessment to inspection.
EV Charger Installation
We install Level 2 (240V) home chargers for every major EV brand — Tesla, ChargePoint, FLO, ChargeLab, Grizzl-E, and JuiceBox. Every job starts with a free assessment of your panel and garage or driveway layout, so you get a straight answer on cost before any work begins.
- Free home assessment and load check
- ESA permit and inspection included
- Smart load management for older panels
- Most installs completed in 3-5 hours
Popular EV Chargers We Install
Already own a charger? We're happy to quote installation only.
Tesla Wall Connector
Model S, 3, X, Y — high-speed home charging.
ChargePoint Home Flex
Smart, app-connected, works with every EV model.
FLO Home
Reliable, Canadian-made Level 2 charging.
Grizzl-E Classic
Durable and affordable, built for GTA winters.
ChargeLab
Smart charging with usage tracking and scheduling.
JuiceBox
Compact smart charger for any major EV brand.
Electrical Panel Upgrade
Older homes in the GTA often have 60A or 100A panels that can't safely support an EV charger, a hot tub, or modern appliance loads. We upgrade panels to 100A, 125A, or 200A service, done to code and inspected by the ESA.
- Free panel assessment before any quote
- 100A, 125A, and 200A service upgrades
- Knob-and-tube and fuse panel remediation
- Utility coordination handled for you
Do You Need a Panel Upgrade?
Breakers trip often
Frequent tripping is usually a sign your panel can't keep up with your home's electrical demand.
Panel is 60A or fuse-based
Older fuse panels and 60A services rarely have room for an EV charger or major appliances.
Insurance or renovation requirement
Some insurers and renovation permits require a modern panel before coverage or approval.
Four Steps, One Licensed Team
Free assessment
We review your panel and needs, on-site or by video.
Straight quote
One flat price covering labour, materials, and permit.
Licensed install
Our electricians complete the work to ESA code.
Inspection & walkthrough
We book the ESA inspection and show you the finished work.
Frequently Asked Questions
Typically 3-5 hours, depending on your setup and the type of charger being installed.
Common signs are frequent breaker trips, a 60A fuse panel, or an insurer/renovation requiring modern service. We confirm for free during your assessment.
Yes — both EV charger installs and panel upgrades require an ESA permit and inspection, which we handle as part of the job.
Often yes, if a panel upgrade is needed to support your new charger. We plan both into a single project timeline where possible.
Ready to Get Started?
Tell us what you need and we'll follow up with a free, no-obligation quote.