ECRA/ESA License #7011912  ·  Licensed & Insured Electrical Contractor
Service 01

EV Charger Installation

We install Level 2 (240V) home chargers for every major EV brand — Tesla, ChargePoint, FLO, ChargeLab, Grizzl-E, and JuiceBox. Every job starts with a free assessment of your panel and garage or driveway layout, so you get a straight answer on cost before any work begins.

  • Free home assessment and load check
  • ESA permit and inspection included
  • Smart load management for older panels
  • Most installs completed in 3-5 hours
Charger options

Popular EV Chargers We Install

Already own a charger? We're happy to quote installation only.

⚡

Tesla Wall Connector

Model S, 3, X, Y — high-speed home charging.

⚡

ChargePoint Home Flex

Smart, app-connected, works with every EV model.

⚡

FLO Home

Reliable, Canadian-made Level 2 charging.

⚡

Grizzl-E Classic

Durable and affordable, built for GTA winters.

⚡

ChargeLab

Smart charging with usage tracking and scheduling.

⚡

JuiceBox

Compact smart charger for any major EV brand.

Service 02

Electrical Panel Upgrade

Older homes in the GTA often have 60A or 100A panels that can't safely support an EV charger, a hot tub, or modern appliance loads. We upgrade panels to 100A, 125A, or 200A service, done to code and inspected by the ESA.

  • Free panel assessment before any quote
  • 100A, 125A, and 200A service upgrades
  • Knob-and-tube and fuse panel remediation
  • Utility coordination handled for you
Signs to watch for

Do You Need a Panel Upgrade?

Breakers trip often

Frequent tripping is usually a sign your panel can't keep up with your home's electrical demand.

Panel is 60A or fuse-based

Older fuse panels and 60A services rarely have room for an EV charger or major appliances.

Insurance or renovation requirement

Some insurers and renovation permits require a modern panel before coverage or approval.

How it works

Four Steps, One Licensed Team

1

Free assessment

We review your panel and needs, on-site or by video.

2

Straight quote

One flat price covering labour, materials, and permit.

3

Licensed install

Our electricians complete the work to ESA code.

4

Inspection & walkthrough

We book the ESA inspection and show you the finished work.

Questions

Frequently Asked Questions

How long does EV charger installation take? +

Typically 3-5 hours, depending on your setup and the type of charger being installed.

How do I know if I need a panel upgrade? +

Common signs are frequent breaker trips, a 60A fuse panel, or an insurer/renovation requiring modern service. We confirm for free during your assessment.

Do I need a permit for either service? +

Yes — both EV charger installs and panel upgrades require an ESA permit and inspection, which we handle as part of the job.

Can I get both done in one visit? +

Often yes, if a panel upgrade is needed to support your new charger. We plan both into a single project timeline where possible.

Ready to Get Started?

Tell us what you need and we'll follow up with a free, no-obligation quote.

Call Now